HappyWaste
Built at Junction 2025 with Charlie Headon (opens in a new tab), using historical operating data from the Blominmäki pumping station in Finland. We built a controller to schedule pumps around tunnel level, inflow, electricity prices and operating constraints.
18.24% lower pumping cost